Engineering, Procurement and Construction Services
for Construction Projects
with Tradition since 1925
We provide comprehensive services commencing from site surveys, studies, multi-staged design documents, through planner's supervision during the construction period and consulting engineering to “turn-key” project deliveries for industrial and energy sectors, residential and commercial facilities, water and effluent treatment plants as well as water parks and pool equipment.
INDUSTRIAL BUILDINGS
Construction of new Opal production facility in Brankovice
One of the most important turnkey industrial projects throughout the long Centroprojekt's history for which our company was acting as a design-and-build contractor has become the
construction of OPAL Production Facility in Brankovice for EMS-PATVAG, the Swiss manufacturer of airbag initiators.
PUBLIC BUILDINGS
Oncology Centre at the Tomas Bata
Regional Hospital in Zlín
The Oncology Centre Project at the Tomas Bata Regional Hospital in Zlín has been successfully completed based on our design inputs comprising the planning and building permit submission drawings, the tender documents and the detailed design including interior design.
HEAT & POWER PLANTS
Use of Renewable Energy Sources
In accordance with the nationwide programme in aid of energy savings and utilization of renewable energy sources Centroprojekt prepares design solutions with solar heat collectors, heat pumps and biogas fired co-generation units, as well as biomass boiler plants.
WATER SYSTEMS
EU-funded Projects
Environmental improvement comprising wastewater disposal systems has always been and still is one of the most crucial areas, on which the EU funding is focused.
WATER PARKS & POOLS
Prameň hotel in Dudince
The Dudince Health Resort is situated in the neighbouring Slovak Republic, in the Banska Bystrica Region and the Krupina District. The Prameň Hotel can be found in the very heart of the town of Dudince.
Refurbishment of indoor pool at Grand Hotel Permon
From April to August 2009, the indoor pool at Permon Grand Hotel located at Podbánske, a popular tourist destination in the High Tatra mountain region, was undergoing major refurbishment and extension.
Open-air swimming pool in Velké Karlovice
Because of its overall unsatisfactory condition the whole swimming complex in Velké Karlovice had to undergo full redevelopment. A leisure pool sized 24m x 15m made from stainless steel has been laid into the old concrete pool.
Hutisko-Solanec swimming facility refurbishment
The existing swimming facility of concrete, which was constructed and put into service nearly 30 years ago, did not meet basic sanitary standards any more. The facility consisting of the swimming and wading pools was therefore entirely reconstructed.
Outdoor swimming facility in Hranice na Moravě
Refurbishment work has given the outdoor complex a brand-new look. Shape of the existing 50m ceramic pool has been changed as it was generally featureless for the eye. It has been converted into a multi-use pool provided with a blue DLW liner.
Renovation and extension of Přerov indoor swimming complex
Renovation of the complex was running during October and November 2008. In this phase, old ceramic children’s pool has been fitted out with new pool equipment, and the hall with a 50-metre swimming pool has been extended to incorporate a new whirlpool as well as a massage pool made from stainless steel.
Galandia Thermal Centre – Water World
Thermal bath spa comprises indoor and outdoor stainless pools offering the visitors both leisure and fitness swimming in a 25m long pool with six lanes or relaxation in fun pools provided with amazing water features, air and water massage jets as well as three slides.